|
049-One of the ponds was located in an area of solid limestone. This picture shows an excavator digging out the rock. The excavated rock was sufficient, when crushed, to provide stone for every requirement of the phase 2 reclamation project. |
« | < | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | > | » |
Total images: 106 | Last update: 26/02/09 14:02 | Generated by JAlbum 7.2 & Chameleon | Help |