Up 1-Surface Reconstruction Work at Warsop Main Colliery During the 1950's Prev Next Slideshow

 Previous image  Next image  Index page
14-Route of
15-A view
16-Another
17-1957 general
18-In February
  19 Also in.jpg - 019-Also in February 1957, with the new fans commissioned and the concrete foundations for the new No2 Shaft Winder Tower in place, the first sections of the new tower were erected and then the No. 2 shaft could be sealed at ground level, the existing headgear demolished, and preparations made to erect the new airseal at ground level and further sections of the new winding tower when programmed.  
20-Everything
21-The installation
22-The installation
23-The installation
24-The installation

019-Also in February 1957, with the new fans commissioned and the concrete foundations for the new No2 Shaft Winder Tower in place, the first sections of the new tower were erected and then the No. 2 shaft could be sealed at ground level, the existing headgear demolished, and preparations made to erect the new airseal at ground level and further sections of the new winding tower when programmed. Download
Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | > | »
Total images: 60 | Help