Up 1-Surface Reconstruction Work at Warsop Main Colliery During the 1950's Prev Next Slideshow

 Previous image  Next image  Index page
48-Installation
49-No.2 Tower
50-Another
51-Everything
52-No.1 Tower
  53-Another.jpg - 053-Another view of the completed No.2 Shaft winding system and the new adjacent Dense Medium Washery plant. In the foreground there are a number of long flatbed wagons carrying steel beams.  
54-A side
55-Another
56-Another
57-Both
58-By the

053-Another view of the completed No.2 Shaft winding system and the new adjacent Dense Medium Washery plant. In the foreground there are a number of long flatbed wagons carrying steel beams. Download
« | < | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 |
Total images: 60 | Help