Up 1-Surface Reconstruction Work at Warsop Main Colliery During the 1950's Prev Next Slideshow

 Previous image  Next image  Index page
52-No.1 Tower
53-Another
54-A side
55-Another
56-Another
  57-Both.jpg - 057-Both winding towers are complete; No.1 Shaft inner tower structure has yet to be installed; the original headgear demolished and the new winding system commissioned.  
58-By the
59-A view
60-A distant
 
 

057-Both winding towers are complete; No.1 Shaft inner tower structure has yet to be installed; the original headgear demolished and the new winding system commissioned. Download